Short answer

Yes, a great deal. The isocyanate side of a spray rig partially cures on contact with the moisture in ordinary air, forming hard crystals that plug the inlet screens, score the pump seals and drop the A-side pressure below the B-side. Graco, which builds the Reactor proportioners, tells operators to purge the material "if not spraying weekly" and to purge or circulate it if the rig will sit for one to two weeks. A rig in weekly use is maintained by the work itself; a rig that sits between occasional jobs has to be purged, cleaned and test-sprayed before it is ready for your wall.

FoamGuard

How FoamGuard handles it

  • The equipment is in use. Spray foam is FoamGuard's only trade, so the proportioner, hose and gun are sprayed, parked nightly, cleaned and purged on the manufacturer's schedule rather than between long gaps.
  • Settings follow the product. The Agreement requires installation to the manufacturer's published specifications and application guidelines (Section 9): the 1:1 ratio, the pressure window and the A, B and hose temperatures on the data sheet of the foam named on your quote.
  • The test comes first. Test patterns on cardboard before the first pass on your building; any off-ratio foam is stopped, cut out and the cause found before spraying resumes. You can watch the depth-gauge measurements at the walkthrough (Section 2).

From the Project Agreement, Sections 2 and 9.

Industry

What's typical elsewhere

Graco's Reactor manual, under "Moisture Sensitivity of Isocyanates": "Exposure to moisture (such as humidity) will cause ISO to partially cure, forming small, hard, abrasive crystal that become suspended in the fluid. Eventually a film will form on the surface and the ISO will begin to gel, increasing in viscosity." "Partially cured ISO will reduce performance and the life of all wetted parts." For storage, Graco says to flush and fill the system with "a DOP, TCP, or moisture-free oil" and "never store your proportioner dry or with spray foam/polyurea materials still in the proportioner, hoses, and gun."

The daily and weekly routine Graco lays out across its training checklist and education center: park the pump every night to immerse the pump rods, clean the A-side inlet screen at daily startup, grease the gun daily, purge if not spraying weekly, and every one to four weeks completely disassemble and clean the gun's fluid section. The EPA's contractor checklist asks installers to "Verify and record: material temperatures, pressures, and ratios" and to "Perform a small test spray and check foam quality after five minutes."

What an idle rig does to your foam

Where the crystals formWhat it doesWhat you see on the wall
A-side inlet screenRestricts flow; A pressure lags BSoft, spongy or shrinking foam (too much B)
Pump packings and sealsAbrasive wear; pressure can't holdPattern changes mid-pass; ratio drifts
Gun ports and check valvesPlugged impingement portsSpitting, a lopsided pattern, pressure imbalance alarms

The full schedule is in why spray foam equipment can't sit idle; the foam symptoms are in off-ratio spray foam.

Want a number for your own project? Price My Project, book a free visit or call (814) 208-3478.

More on this

How can I tell if a rig has been sitting?

Ask when it last sprayed a job and when the A-side screens and wet cups were serviced. Then watch for the test spray on cardboard before the crew starts on your building.

Can a contractor fix a rig that sat too long?

Yes, with a full flush, new screens and seals where needed, and a test spray that proves the ratio. The question is whether it was done before your job rather than discovered during it.

Does the hose matter too?

Yes. BASF notes that every 50 feet of hose holds about half a gallon of resin, and the A line holds as much isocyanate; the hose is part of what Graco's checklist says to purge if the rig is not spraying weekly.

Sources

  1. Graco: Reactor E-30 Operation Manual 333023, rev. U (Moisture Sensitivity of Isocyanates)
  2. Graco: Reactor Startup Checklist, Reactor & Fusion Training (Oct. 23, 2006)
  3. Graco Education Center: What fluid should I use when storing a Graco Reactor unit for a long period of time?
  4. US EPA: Contractor Checklist, Guide to Safer Workplace Practices for Installing High-Pressure, Two-Component SPF (working draft, Jan. 22, 2015)
  5. BASF: WALLTITE Series HFO Spray Foam Insulation Application Guidelines (Feb. 9, 2023)