Short answer

It is the last step of the job: you and FoamGuard walk the finished work together on Completion Day, check thickness with depth gauges, look at coverage, trim and cleanup, and sign the Completion & Walkthrough Record. Anything still to finish is written on the record with a fair value beside it, and you hold back only that amount until it is done. Afterward you get the project file: before-and-after photos, the thermal-camera scan, the foam type and drum lot numbers, and your warranty certificate once the job is paid.

FoamGuard

How FoamGuard handles it

  • Completion Day. The day the foam is fully applied and we walk the finished work with you and sign the Completion & Walkthrough Record (Section 6.2).
  • Thickness. We check depth with gauges while we spray, and you are welcome to watch the measurements at the walkthrough. Thickness is a nominal average across each surface; natural texture and minor variation are normal (Section 2.2).
  • Coverage, trim and cleanup. Every area on page 1 of the Agreement, foam trimmed flush, masking off, overspray dealt with and the work area broom-clean (Section 12).
  • Items to finish. Written on the record with an agreed value; you hold back only that amount until it is done (Section 6.6).
  • If you can't be there. Photos and depth-gauge readings the same day, and the walkthrough within two business days at a time that suits you (Section 6.4).
  • The project file. Emailed at completion: photos of the work before and after, the thermal-camera scan, the foam type and drum lot numbers, and the warranty certificate with its ID once every payment is recorded. The manufacturer's warranty is registered within 7 days and the confirmation forwarded.

From the Project Agreement, Sections 2, 6 and 12.

Industry

What's typical elsewhere

Federal law sets one record every insulation customer should get. Under the FTC's R-value Rule, an installer must give the customer a contract or receipt that shows the coverage area, thickness and R-value of the insulation installed, dated and signed by the installer (16 CFR § 460.17).

Beyond that, walkthroughs and job records vary by contractor; ask before you sign what is checked at the end, whether you can see the depth readings, and what you get in writing.

Want a number for your own project? Price My Project, book a free visit or call (814) 208-3478.

More on this

What if I'm not happy at the walkthrough?

Say so and we write it on the record. We complete or put right each item promptly, and you hold back only its agreed value until it is done.

Do I need to measure the foam myself?

No, but you are welcome to watch us take the depth readings.

What are drum lot numbers for?

They identify the exact batch of foam that went into your building, which the manufacturer can trace if a question ever comes up.

How long does the walkthrough take?

It depends on the size of the job; it covers every area on the Agreement, so plan to walk all of it with us.