Skip to content

LEED projects · Huntsman D-Max Wall

Three LEED-certified buildings, and the wall’s share of the points.

Three of Quebec’s new Maisons des aînés (seniors’ homes) were certified under LEED v4 BD+C: Healthcare with the D-Max Wall. Here is each scorecard, the points earned in the credits the wall takes part in, and a fourth project going up now.

  • 3LEED v4 Healthcare certifications, awarded 2024–2025
  • SilverRepentigny, 54 points; Longueuil 49 and Alma 46, Certified
  • 15 of 20Optimize Energy Performance points at Longueuil, the most of the three
  • 37–45%of each scorecard earned in credits the wall takes part in

Where the points came from

Points per building, out of 110. Subtract the energy and comfort credits the envelope drives, and each of the three would have scored below the 40 needed to certify.

Energy and comfort credits the envelope drivesMaterials credits the insulation counts towardAll other credits

Dashed lines: 40 points to certify, 50 for Silver, 60 for Gold.

From the USGBC scorecards linked below. How we counted is explained under the three projects.

Repentigny, Quebec · LEED v4 BD+C: Healthcare

Maison des aînés Repentigny

Silver54 of 110 points · awarded May 2024

22 of 54 points (41%) were earned in credits the wall takes part in: 17 in energy and comfort credits the envelope drives, 5 in materials credits the insulation counts toward. Without the 17 energy and comfort points the building would have scored 37, below the 40 needed to certify.

CreditEarnedWhere the wall comes in
Optimize energy performance12 / 20The envelope is a direct input to the whole-building energy model. On the ASHRAE 90.1-2010 path, 12 points in Healthcare means at least 24% lower energy cost than the baseline (Canadian projects can also use an NECB path with its own thresholds).
Regional priority: optimize energy performance1 / 1Awarded with the credit above where the regional threshold is met.
Enhanced commissioning: envelope (Option 2)2 / 2Earned 6 of 6 commissioning points. Six is only possible with envelope commissioning (Option 2, 2 points), so those 2 are counted here.
Thermal comfort1 / 1The credit requires the HVAC and the building envelope to be designed to ASHRAE 55, where interior surface temperatures and drafts count.
Regional priority: thermal comfort1 / 1Awarded with the credit above.
Low-emitting materials3 / 3Thermal and acoustic insulation is one of the product categories counted.
Product disclosure: EPD1 / 2The insulation can be one of the 20 products from 5 manufacturers.
Product disclosure: material ingredients1 / 2Same 20-product count.

Longueuil, Quebec · LEED v4 BD+C: Healthcare

Maison des aînés de Longueuil

Certified49 of 110 points · awarded September 2025

22 of 49 points (45%) were earned in credits the wall takes part in: 18 in energy and comfort credits the envelope drives, 4 in materials credits the insulation counts toward. Without the 18 energy and comfort points the building would have scored 31, below the 40 needed to certify.

CreditEarnedWhere the wall comes in
Optimize energy performance15 / 20The envelope is a direct input to the whole-building energy model. On the ASHRAE 90.1-2010 path, 15 points in Healthcare means at least 32% lower energy cost than the baseline (Canadian projects can also use an NECB path with its own thresholds).
Regional priority: optimize energy performance1 / 1Awarded with the credit above where the regional threshold is met.
Enhanced commissioning: envelope (Option 2)0 / 2Earned 3 of 6 commissioning points: systems commissioning only, so nothing is counted here.
Thermal comfort1 / 1The credit requires the HVAC and the building envelope to be designed to ASHRAE 55, where interior surface temperatures and drafts count.
Regional priority: thermal comfort1 / 1Awarded with the credit above.
Low-emitting materials2 / 3Thermal and acoustic insulation is one of the product categories counted.
Product disclosure: EPD1 / 2The insulation can be one of the 20 products from 5 manufacturers.
Product disclosure: material ingredients1 / 2Same 20-product count.

Alma, Quebec · LEED v4 BD+C: Healthcare

Maison des aînés Alma

Certified46 of 110 points · awarded March 2025

17 of 46 points (37%) were earned in credits the wall takes part in: 12 in energy and comfort credits the envelope drives, 5 in materials credits the insulation counts toward. Without the 12 energy and comfort points the building would have scored 34, below the 40 needed to certify.

CreditEarnedWhere the wall comes in
Optimize energy performance8 / 20The envelope is a direct input to the whole-building energy model. On the ASHRAE 90.1-2010 path, 8 points in Healthcare means at least 16% lower energy cost than the baseline (Canadian projects can also use an NECB path with its own thresholds).
Regional priority: optimize energy performance0 / 1Awarded with the credit above where the regional threshold is met.
Enhanced commissioning: envelope (Option 2)2 / 2Earned 6 of 6 commissioning points. Six is only possible with envelope commissioning (Option 2, 2 points), so those 2 are counted here.
Thermal comfort1 / 1The credit requires the HVAC and the building envelope to be designed to ASHRAE 55, where interior surface temperatures and drafts count.
Regional priority: thermal comfort1 / 1Awarded with the credit above.
Low-emitting materials3 / 3Thermal and acoustic insulation is one of the product categories counted.
Product disclosure: EPD1 / 2The insulation can be one of the 20 products from 5 manufacturers.
Product disclosure: material ingredients1 / 2Same 20-product count.

How we counted

LEED awards points to the whole building, not to a product, so no scorecard says “these points came from the insulation.” What a scorecard does show is which credits were earned. We counted two groups:

  • Energy and comfort credits the envelope drives: Optimize Energy Performance (the wall’s U-value and air tightness go straight into the energy model), envelope commissioning where the project earned it, Thermal Comfort, and the regional-priority points awarded with them. The HVAC and lighting design also count toward these.
  • Materials credits the insulation counts toward: Low-Emitting Materials (thermal insulation is one of the product categories) and the two product-disclosure credits (the insulation can be one of the 20 products). Many other products count toward these too.

So the honest reading is that 37–45% of each scorecard came from credits the wall takes part in, and that the envelope-driven energy and comfort credits were the difference between certified and not certified on all three. Your energy modeler can show the same thing on your project by running it with a code-minimum wall and with the tested D-Max values.

About the foam: in Quebec the D-Max Wall is sprayed with Huntsman’s Heatlok Soya HFO, the foam Huntsman’s case study names for the Maisons des aînés program. In Pennsylvania and Ohio it is sprayed with HEATLOK HFO High Lift or HFO Pro, which have their own U.S. test data and code reports (see the engineers page).

Going up now · pursuing LEED

Îlot Angus, Montreal

350 affordable, eco-responsible homes in four residential buildings at the Technopôle Angus, developed by the Société de développement Angus, with first tenants planned for late summer 2027 (City of Montreal, June 2026). These are photos from the job: the D-Max Wall from bare studs to foamed floors.

Photos: Îlot Angus job site.

Planning a LEED project?

Send us the wall sections or the energy model targets and we’ll show you where a D-Max wall fits on your scorecard. Or we’ll walk your team through the system in about 45 minutes.

Sources

  1. USGBC project directory and LEED v4 BD+C: Healthcare scorecards: Maison des aînés Repentigny (Silver, May 2024), Maison des aînés de Longueuil (Certified, Sep 2025), Maison des aînés Alma (Certified, Mar 2025).
  2. LEED v4 Healthcare credit language via LEEDuser (BuildingGreen): Optimize Energy Performance (8, 12 and 15 points in Healthcare = at least 16%, 24% and 32% for new construction on the ASHRAE 90.1-2010 path), Enhanced Commissioning (Option 2 envelope commissioning, 2 points), Low-Emitting Materials, Thermal Comfort, EPD, Material Ingredients.
  3. Huntsman Building Solutions, Maisons des Aînés et Maisons Alternatives case study (2023): Huntsman closed-cell foam across 46 projects in Quebec.
  4. City of Montreal, press release on L’Îlot Angus, June 18, 2026.
Call Ask about a project